Hampden County · Ludlow, the front page ›
Ludlow
Data through FY2026; built November 9, 2026.
State House
- 7th Hampden · Aaron L. Saunders
State Senate
- Hampden, Hampshire and Worcester · Jacob R. Oliveira
School districts
- Ludlow Public Schools, the town’s own district
Regional planning agency
Pioneer Valley Planning Commission
Habitat, forest and water
This is what the state sends your town: aid, grants and earmarks, and how they compare with towns like it. What the money has to cover is on the other pages: the roads in flood zones, the land the state holds here, and the legislators whose posts shape the earmarks.
Ludlow, in brief
Ludlow is a town of 20,904 people on 27.2 square miles of Hampden County, 769 to the square mile, about the middle of the state for density. Median household income is $85,000, below the median town’s $114,000. State aid is a large part of its budget: it covered 23.8% of general-fund spending in FY2025, against 11.5% for the median town. On the Fairness Index it scores 42 for all state aid and 54 for discretionary money — below its share on all state aid, about its share on the money legislators and agencies choose to give. Its Land and Water Index is 53, 156th of 351. The state owns 8% of its land, on which it paid $54,000 in lieu of taxes in FY2026, $39.04 an acre against $117 statewide. The forest now covers about 55% of the town, up from the 35% the surveyors drew in 1830. On the strong side: measured against what it maintains, it received 1.85 times its proportional share of competitive grants.
No measure on this page puts it among the weaker towns in the state.
The openings are specific: $2.2 million of its Chapter 90 road money is apportioned and not yet drawn; 1,962 acres of core habitat, 45% of it, sit on land with no protection, the acreage state and land-trust programs exist to fund. The risks are equally specific: one of its bridges is rated poor and it owns two high- or significant-hazard dams; emerald ash borer has been mapped in town by the aerial survey since 2019; it has lost 6.2% of its tree cover since 2001, 1.5 times the statewide rate, the largest year being 2020.
Written by rule from the figures on this page: each clause appears only when the town sits well away from the middle of the state on that measure, so a shorter story means a more ordinary record. Every figure is in the cards below with its source.
Fairness Index · all state aid
42 / 100
199th of 351 · stable low
Fifty is a fair share.
See the index ›
Fairness Index · discretionary money
54 / 100
177th of 351
Grants and earmarks only.
See the index ›
Land and Water Index
53 / 100
156th of 351
Fifty is the median town.
Full land page ›
At a glance
- Fairness IndexLudlow scores 42 on the Fairness Index for all state aid and 54 for discretionary money. Fifty is a fair share.Read more ›
- State moneyLudlow’s town government and school districts received $221 million in formula aid and $8.5 million in competitive grants over ten years.Read more ›
- EarmarksLudlow received $735,000 in local earmarks to its government, $2.8 million placed in the city or town and $2.8 million counting everything placed, in ten enacted state budgets.Read more ›
- Aid and chargesIn FY2027 the state’s cherry sheet sends Ludlow $20.7 million and takes back $2.1 million in assessments and charges, a net $18.6 million.Read more ›
- Money to othersState programs also awarded $4.7 million to organizations in Ludlow other than the town government, FY2016–FY2027.Read more ›
- Expected and actualLudlow received $11.3 million in earmarks placed in the city or town and competitive grants over ten years, 47% more than the $7.7 million its size, need and institutions predict.Read more ›
- What the town carriesMeasured against what it maintains, Ludlow received 1.85 times its proportional share of competitive grant awards.Read more ›
- Roads and bridgesLudlow has $2.2 million of Chapter 90 road money from FY2017–FY2026 not yet reimbursed; it owns two bridges rated poor and two high- or significant-hazard dams.Read more ›
- Costs and the 2½% limitState aid covered 23.8% of Ludlow’s general-fund spending in FY2025, down from 34.2% in FY2006.Read more ›
- State landLudlow has 1,376 acres of mapped state conservation and recreation land and 1,047 acres of land coded as chapter land.Read more ›
- Habitat and waterLudlow has 4,331 acres of mapped core habitat, 25% of its land area; 1,962 of those acres are outside any protected land.Read more ›
- SchoolsLudlow’s required school contribution is 2.8% of median household income, 136th highest of 351.Read more ›
- School buildingsThe Massachusetts School Building Authority approved grants of up to $27.9 million for schools serving Ludlow, FY2017 to August 2026.Read more ›
- PeersLudlow ranks 1st of 11 on earmark dollars placed in the city or town per resident among itself and its ten nearest peers.Read more ›
Fairness Index
Ludlow scores 42 on the Fairness Index for all state aid and 54 for discretionary money. Fifty is a fair share.
All state aid
42 / 100199th of 351 (1 = most above its share)
Rank under other weightings: 165th to 233rd.
Stable low: below 45 under every weighting
Ludlow received less than its share of state aid on all four measures; its blended score of 42 stays between 39 and 44 under every weighting tested.
Discretionary money only
54 / 100177th of 351 (1 = most above its share)
Rank under other weightings: 158th to 190th.
Weighting-dependent: the range crosses the 45–55 band
Ludlow received more than its share of discretionary money on two of four measures; its blended score of 54 stays between 51 and 56 under every weighting tested.
Each bar is one way of defining a fair share: Equal, the same per resident; Need, weighted toward poverty, low income and a thin tax base; Burden, by what each program pays for (road miles, bridges, pupils and so on); Effort, by what residents already pay in property tax relative to their income. The line marks 50. The score is the average of the four. Discretionary money is competitive grants and earmarks to the city or town government. How the index is built.
State money, FY2017–FY2026
Ludlow’s town government and school districts received $221 million in formula aid and $8.5 million in competitive grants over ten years.
Formula aid
$221M
$10,596 per resident (163rd of 351) · gross
Competitive grants
$8.5M
$407 per resident (165th of 351)
Earmark-account payments
$404,000
$19.31 per resident (207th of 351)
Each class has its own scale. Bars show dollars paid in each fiscal year.
Formula aid is gross: Chapter 70 as DESE attributes it to the town, and cherry-sheet aid before the state deducts charges such as charter tuition and transit assessments, plus other formula programs as paid. Competitive grants and earmark-account payments are Comptroller payments to the town government and its school districts (stage: paid), the same payees as the Fairness Index. Enacted earmarks and earmark payments are different things: enacted earmarks are budget clauses, counted three ways above; earmark-account payments are Comptroller payments to the town government and its school districts from accounts classified as earmarks, which can include prior-year and statewide-program money. Either can be larger. Shared revenue, pass-through contracts, transfers to state entities and unclassified payments, $16M in all, are not shown. Rank 1 is the highest amount per resident among 351.
Formula aid is gross; competitive grants and earmark-account payments are as paid. Other classes, $16 million, are not shown.
Earmarks
Ludlow received $735,000 in local earmarks to its government, $2.8 million placed in the city or town and $2.8 million counting everything placed, in ten enacted state budgets.
To the city or town government
$735,000
$35.16 per resident (137th of 351)
Placed in the city or town
$2.8M
$132 per resident (36th of 351) · 73% to organizations
Everything placed
$2.8M
$132 per resident (43rd of 351) · 73% to organizations
No earmarks in ten state budgets
No
35 municipalities had none
Local earmarks are counted three ways: money to Ludlow’s government, its schools or municipal projects; money placed in Ludlow, adding organizations; and everything placed, adding state facilities located here. Three ways to count a local earmark.
Placed in the city or town: 23 clauses in nine of ten state budgets; the most recent in FY2026. $735,000 went to Ludlow’s government, its schools or municipal projects; the other $2 million went to organizations in Ludlow or named with it, some of which serve a wider area.
Show Every local earmark in Ludlow, FY2017–FY2026, largest first (23 clauses; the town’s share where a clause names several towns) · 23 rows
| Year | Amount | Budget text (excerpt) | Stage |
|---|---|---|---|
| FY2026 | $350,000 | “the Westmass Area Development Corporation to offset and pay any and all costs incurred and related to, but not limited to, operational costs and expenses involved with the revitalization of the Ludlow Mills Industrial Complex” | Enacted organization named with the town |
| FY2025 | $350,000 | “the Westmass Area Development Corporation to offset and pay any and all costs incurred and related to, but not limited to, operational costs and expenses involved with the revitalization of the Ludlow Mills Industrial Complex” | Enacted organization named with the town |
| FY2024 | $350,000 | “offset and pay all costs incurred and related to, but not limited to, operational costs and expenses involved with the revitalization of the Ludlow Mills industrial complex for Westmass Area Development Corporation” | Enacted organization named with the town |
| FY2023 | $350,000 | “the Westmass Area Development Corporation to offset and pay any and all costs incurred and related to, but not limited to, operational costs and expenses involved with the revitalization of the Ludlow Mills industrial complex” | Enacted organization named with the town |
| FY2022 | $350,000 | “the Westmass Area Development Corporation to offset and pay any and all costs incurred and related to, but not limited to, operational costs and expenses involved with the revitalization of the Ludlow Mills Industrial Complex” | Enacted organization named with the town |
| FY2024 | $100,000 (split two ways) | “construction and repairs to the Cottage avenue bridge in the towns of Wilbraham and Ludlow” | Enacted to the city or town government |
| FY2020 | $100,000 | “the town of Ludlow for the replacement of the Ludlow High School track” | Enacted to the city or town government |
| FY2019 | $100,000 | “sidewalk rehabilitation in Ludlow” | Enacted to the city or town government |
| FY2018 | $100,000 | “the Lupa Zoo and Game Farm, Inc. in Ludlow” | Enacted organization named with the town |
| FY2017 | $100,000 | “the repair and replacement of bleachers in Whitney park in the town of Ludlow” | Enacted to the city or town government |
| FY2019 | $90,000 | “a needs assessment for the intersections of Fuller street Chapin street and Cady street Fuller street in Ludlow” | Enacted to the city or town government |
| FY2024 | $75,000 | “the Lupa Game Farm, Inc. in the town of Ludlow” | Enacted organization named with the town |
| FY2026 | $50,000 | “the Ludlow department of veterans’ services for services including, but not limited to, monthly veterans’ lunches, food pantry supports and outreach programming” | Enacted to the city or town government |
| FY2025 | $50,000 | “the Ludlow department of veterans’ services for services including, but not limited to, monthly veterans’ lunches, food pantry supports and outreach programming” | Enacted to the city or town government |
| FY2024 | $50,000 | “the department of veterans’ services in the town of Ludlow for services including, but not limited to, monthly veterans’ lunches, food pantry supports and outreach programming” | Enacted to the city or town government |
| FY2023 | $50,000 | “the Ludlow Senior Center to cover costs and related expenses in purchasing a new accessible van to provide transportation to seniors in the community” | Enacted to the city or town government |
| FY2024 | $35,000 | “the Boys & Girls Club of Ludlow to cover costs including, but not limited to, the cost of refinishing the gym bleachers for safety” | Enacted organization named with the town |
| FY2026 | $25,000 | “the Lupa Zoo in Ludlow” | Enacted organization named with the town |
| FY2025 | $25,000 | “the Lupa Game Farm, Inc. in Ludlow” | Enacted organization named with the town |
| FY2024 | $25,000 | “911 compliance in the town of Ludlow” | Enacted to the city or town government |
| FY2017 | $20,000 | “cover the costs associated with the construction and maintenance of a veterans’ memorial in the town of Ludlow” | Enacted to the city or town government |
| FY2026 | $10,000 | “Operation Veteran Vacation Inc. in the town of Ludlow for programming” | Enacted organization named with the town |
| FY2026 | $7,500 | “the Ludlow's Boys and Girls Club for the improvements to the outdoor playscape and recreation options” | Enacted organization named with the town |
Printed: the 5 largest of 23 clauses; the web page lists all of them.
Enacted earmarks and earmark payments are different things: enacted earmarks are budget clauses, counted three ways above; earmark-account payments are Comptroller payments to the town government and its school districts from accounts classified as earmarks, which can include prior-year and statewide-program money. Either can be larger.
What the state sends and takes back
In FY2027 the state’s cherry sheet sends Ludlow $20.7 million and takes back $2.1 million in assessments and charges, a net $18.6 million.
Sent: estimated receipts
$20.7 million
FY2027 cherry sheet
Taken back: assessments and charges
$2.1 million
10% of what is sent
Net
$18.6 million
receipts less charges
| Line | FY2027 |
|---|---|
| Chapter 70 | $15.4M |
| Charter Tuition Reimbursement | $300,000 |
| School Choice Receiving Tuition | $466,000 |
| Unrestricted General Government Aid | $3.9M |
| Veterans Benefits | $250,000 |
| Exemp: VBS and Elderly | $292,000 |
| State Owned Land | $54,000 |
| Public Libraries | $67,000 |
| Line | FY2027 |
|---|---|
| Air Pollution Districts | $5,870 |
| RMV Non-Renewal Surcharge | $13,000 |
| Regional Transit | $118,000 |
| Special Education | $37,000 |
| School Choice Sending Tuition | $944,000 |
| Charter School Sending Tuition | $963,000 |
Source: Division of Local Services, FY2027 cherry sheets (C.S. 1-ER receipts and C.S. 1-EC charges), final. Charges include county tax, mosquito control, air pollution districts, planning councils, the MBTA and regional transit, and tuition the town pays for its students who attend charter schools or other districts by school choice. In towns that belong to a regional school district, Chapter 70 goes to the district, not the town, so it does not appear here.
State money to others in Ludlow
State programs also awarded $4.7 million to organizations in Ludlow other than the town government, FY2016–FY2027.
These are competitive grants to nonprofits, tribal nations, regional bodies, state agencies and businesses located in or serving Ludlow. They are listed for completeness. They are not counted in the town’s state money or its Fairness Index, because the money does not go to the town government. Where a program has a measure of need for the town, these awards do enter the burden index above; where it has none, they are left out of it. Many of these organizations serve a wider area than the town where they are based.
| Year | Recipient | Program | Amount |
|---|---|---|---|
| FY2024 | WinnDevelopment nonprofit | Community One Stop for Growth | $500,000 |
| FY2017 | Ludlow Mills Riverwalk nonprofit | MassWorks Infrastructure Program | $430,000 |
| FY2022 | Lupa Game Farm nonprofit | Cultural Facilities Fund | $90,000 |
| FY2026 | Exit Seven Players nonprofit | Cultural Facilities Fund | $44,000 |
A further $3.6 million in 7 awards went to businesses, farms and recipients the source does not name; they are counted here but not named, because a farm or small business often carries a family’s name.
Source: the project’s award catalog (state agency award lists and announcements); awards marked as counting toward totals. Earmarks to organizations based in the town are in the earmarks section above, on the second and third measures.
Expected and actual
Ludlow received $11.3 million in earmarks placed in the city or town and competitive grants over ten years, 47% more than the $7.7 million its size, need and institutions predict.
The expectation comes from a statewide model of all 351 municipalities that uses population, road miles, jobs, poverty, income, tax base, school-aid share and the presence of hospitals, colleges and nonprofits. Those factors explain about 55–60% of the differences between towns. The model leaves out many legitimate reasons a town may receive more or less, such as a single large project, so a gap is a starting point for questions, not a finding about anyone’s conduct.
Earmarks here are placed in the city or town, the second of three measures (enacted); competitive grants are Comptroller payments (paid). Of the earmarks counted here, $2 million (73%) went to organizations based in Ludlow. Method.
What the town carries
Measured against what it maintains, Ludlow received 1.85 times its proportional share of competitive grant awards.
Local road miles
124.0
58th of 351 · 5.9 per 1,000 residents (193rd of 351)
Town-owned bridges, replacement cost
$18.2M
scored exposure $6.9M · counts and condition under Roads, bridges and dams
Road-stream crossings
177
24th of 351 · culverts and small crossings
Town-owned hazard dams
2
high or significant hazard
Land area
27.2 sq mi
8% state-owned
Seasonal homes
1%
share of housing units
Peak service population
21,175
residents plus seasonal
Core infrastructure index
0.07
roads, culverts, dams, coast, flood, energy
The burden index divides the competitive awards Ludlow received from FY2017 to FY2026 by what it would have received if every program had split its money by its own measure of need: road miles for road programs, crossings for culvert grants, town-owned hazard dams for dam repair, jobs for economic development, residents for libraries. 1.0 is proportional. Ludlow: 1.85. State median: 0.91. Bridges count by replacement cost and condition, not by number, and only bridges the town owns. For the index, bridges are valued from the 2025 inventories at the federal unit cost, and a bridge on a town line is shared among the towns it touches; the Roads, bridges and dams section counts them from MassDOT’s current inventory, so its counts can differ slightly. Ranks run from 1, the most among 351.
Burden index 1.85; state median 0.91; 1.0 is proportional. Ranks run from 1, the most among 351.
State land and growth
State land eligible for PILOT
1,377 acres
7.9% of land area · FY2026
State-owned land PILOT, FY2026
$54,000
payment in lieu of taxes, cherry sheet
PILOT per eligible acre
$39.04
statewide $117 · FY2026
New growth per resident
$13,452
FY2017–2025 · 275th of 351 · median town $20,524
State land eligible for PILOT is the Division of Local Services’ count of state-owned acres on which the state pays a payment in lieu of taxes; the payment follows the land’s assessed value, not its acreage, so the per-acre figure is a comparison, not the formula. The state-owned share on the land-area tile above is the MassGIS map of all state-owned open space, a wider count. New growth is the assessed value of new construction and improvements added to the tax base, summed FY2017–FY2025 and divided by 2020–24 residents; taxed at the prior year’s rates, it adds to the levy limit beyond 2.5%.
Roads, bridges and dams
Ludlow has $2.2 million of Chapter 90 road money from FY2017–FY2026 not yet reimbursed; it owns two bridges rated poor and two high- or significant-hazard dams.
Chapter 90 apportioned, FY2017–FY2027
$10.3M
$1.9M of it one-time supplements
Reimbursed against it
$7M
to 16 October 2026
Not yet reimbursed, FY2017–FY2026 money
$2.2M
annual program: 1.2 years of its yearly money · 174th of 351
Town-owned bridges
14
two rated poor; about $6.1M of work on those, by planning estimates
High- or significant-hazard dams
2
of two town-owned dams
Bridge, dam and culvert grants, FY2017–FY2026
$0
bridges $0 · dams $0 · culverts $0
Chapter 90 is the state’s main road program. MassDOT apportions it to every city and town by a formula, and the town is reimbursed after it spends the money on approved work. Counting each payment against the town’s oldest money first, payments to Ludlow came on average 22 months after the start of the year the money was apportioned for. Statewide, $655 million of FY2017–FY2026 apportionments was not yet reimbursed on 16 October 2026; counting the annual program alone, the median town held about 1.2 years of its yearly money. Money not yet reimbursed is not the same as idle money: MassDOT’s Chapter 90 Advisory Group found 63% of the unspent balance committed to approved projects not yet billed (January 2025).
Ludlow owns poor bridges and has no Small Bridge selection or payment in the records found; its poor bridges are outside the program’s 10-to-20-foot range.
Ludlow owns two high- or significant-hazard dams and received no dam award from the Dam and Seawall or Municipal Vulnerability Preparedness programs, FY2017–FY2026.
| Year | Annual apportionment | One-time supplements | Reimbursed in the year (any year’s money) | Year-end balance, FY2017-on money |
|---|---|---|---|---|
| FY2017 | $703,000 | $0 | $1.3M | -$0 |
| FY2018 | $701,000 | $0 | $154,000 | $695,000 |
| FY2019 | $700,000 | $140,000 | $835,000 | $1M |
| FY2020 | $697,000 | $70,000 | $672,000 | $1.1M |
| FY2021 | $694,000 | $0 | $583,000 | $1.2M |
| FY2022 | $694,000 | $410,000 | $779,000 | $1.6M |
| FY2023 | $684,000 | $0 | $1.8M | $443,000 |
| FY2024 | $685,000 | $412,000 | $714,000 | $826,000 |
| FY2025 | $685,000 | $190,000 | $502,000 | $1.2M |
| FY2026 | $1.1M | $629,000 | $716,000 | $2.2M |
| FY2027 (to 16 Oct) | $1.1M | $0 | $0 | $3.3M |
The full list of the 29 bridges in Ludlow in MassDOT’s inventory, with each one’s condition, is on the town’s page at massanomics.com/commonwealth.
Every bridge in Ludlow
Twenty-nine bridges in MassDOT’s inventory, three rated poor and one closed, worst first. The list includes bridges the town does not own; costs are shown for town-owned bridges only. Tap the i beside a heading for what it means.
Show Bridges in Ludlow, MassDOT inventory · 29 rows
| Bridge | Carries | Crosses | Type | Owner | Built | Lowest rating | Condition | Status | Last inspected | Proposed work |
|---|---|---|---|---|---|---|---|---|---|---|
| L16016 | West St (VETERAN MEM. BR.) | Chicopee River | Bridge | Town | 1939 rebuilt 1993 | 2 | Poor deck 2 · super 4 · sub 6 | Closed | 2025-09-30 | $4.5M rehabilitation |
| L16026 | Piney Ln | Broad Brook | Bridge | Town | 1952 | 2 | Poor culvert 2 | Open | 2025-02-10 | $1.5M replacement |
| L16008 | Route 21 Ludlow Ave (PUTTS BRIDGE) | Chicopee River | Bridge | MassDOT | 1930 | 4 | Poor deck 6 · super 4 · sub 5 | Posted for load | 2025-10-13 | |
| L16003 | Miller St | Chicopee River | Bridge | Town | 1939 rebuilt 2006 | 5 | Fair deck 6 · super 5 · sub 6 | Posted for load | 2024-11-06 | $13.8M rehabilitation |
| L16009 | I-90 Exit 54 Ramp | I-90 | Bridge | MassDOT | 1957 rebuilt 1990 | 5 | Fair deck 5 · super 5 · sub 7 | Open | 2025-04-14 | |
| L16010 | I-90 Eb | Route 21 Center St | Bridge | MassDOT | 1957 rebuilt 1995 | 5 | Fair deck 6 · super 5 · sub 5 | Open | 2025-02-24 | |
| L16010 | I-90 WB | Route 21 Center St | Bridge | MassDOT | 1957 rebuilt 1995 | 5 | Fair deck 6 · super 5 · sub 6 | Open | 2025-02-24 | |
| L16011 | Route 21 Center St | Higher Brook | Short span | Town | 1938 | 5 | Fair deck 6 · super 5 · sub 5 | Open | 2025-06-11 | $1.5M likely, at bid prices; $957,000 at unit cost |
| L16022 | I-90 Eb | Miller St | Bridge | MassDOT | 1957 rebuilt 1995 | 5 | Fair deck 7 · super 5 · sub 5 | Open | 2025-09-10 | |
| L16022 | I-90 WB | Miller St | Bridge | MassDOT | 1957 rebuilt 1995 | 5 | Fair deck 6 · super 5 · sub 6 | Open | 2025-09-10 | |
| L16023 | I-90 Eb | East St | Bridge | MassDOT | 1957 rebuilt 1995 | 5 | Fair deck 7 · super 5 · sub 5 | Open | 2025-09-11 | |
| L16023 | I-90 WB | East St | Bridge | MassDOT | 1957 rebuilt 1995 | 5 | Fair deck 6 · super 5 · sub 6 | Open | 2025-09-11 | |
| L16024 | I-90 | Comb Chicopee River/may | Bridge | MassDOT | 1957 rebuilt 1984 | 5 | Fair deck 5 · super 5 · sub 5 | Open | 2025-10-15 | |
| L16002 | East St | Chicopee River | Bridge | Town | 1937 rebuilt 1985 | 6 | Fair deck 6 · super 6 · sub 6 | Open | 2025-11-14 | $5.7M work |
| L16005 | Route 21 Center St | Springfld Res Outl | Short span | Town | 1877 rebuilt 1948 | 6 | Fair culvert 6 | Open | 2025-06-03 | $813,000 likely, at bid prices; $519,000 at unit cost |
| L16007 | I-90 Eb | Chapin St | Bridge | MassDOT | 1957 rebuilt 1995 | 6 | Fair deck 7 · super 6 · sub 6 | Open | 2025-09-03 | |
| L16007 | I-90 WB | Chapin St | Bridge | MassDOT | 1957 rebuilt 1995 | 6 | Fair deck 6 · super 6 · sub 6 | Open | 2025-09-03 | |
| L16014 | I-90 Eb | Fuller St | Bridge | MassDOT | 1957 rebuilt 1995 | 6 | Fair deck 7 · super 6 · sub 6 | Open | 2025-02-14 | |
| L16014 | I-90 WB | Fuller St | Bridge | MassDOT | 1957 rebuilt 1995 | 6 | Fair deck 7 · super 6 · sub 6 | Open | 2025-02-14 | |
| L16015 | Holyoke St | Higher Brook | Bridge | Town | 1901 | 6 | Fair super 6 · sub 6 | Open | 2025-02-05 | $974,000 work |
| L16017 | I-90 WB | West St | Bridge | MassDOT | 1957 rebuilt 1995 | 6 | Fair deck 7 · super 6 · sub 7 | Open | 2025-02-19 | |
| L16018 | West St | Higher Brook | Bridge | Town | 1929 | 6 | Fair deck 6 · super 6 · sub 7 | Open | 2025-02-10 | $956,000 rehabilitation |
| L16020 | Bondsvlle Rd | Broad Brook | Culvert | Town | 1850 rebuilt 1900 | 6 | Fair culvert 6 | Open | 2016-08-30 | |
| L16021 | Fuller St | Higher Brook | Culvert | Town | 1850 rebuilt 1900 | 6 | Fair culvert 6 | Open | 2016-09-02 | |
| L16025 | Rood St | Harris Brook | Culvert | Town | 1850 rebuilt 1900 | 6 | Fair culvert 6 | Open | 2016-09-02 | |
| L16027 | Genovevo Dr | Minechoag Brook | Bridge | Town | 1991 | 6 | Fair deck 6 · super 6 · sub 6 | Open | 2026-08-13 | $875,000 work |
| L16012 | West St | Stony Brook | Bridge | Town | 1956 | 7 | Good deck 7 · super 7 · sub 7 | Open | 2025-09-18 | $635,000 rehabilitation |
| L16017 | I-90 Eb | West St | Bridge | MassDOT | 1957 rebuilt 1995 | 7 | Good deck 7 · super 7 · sub 7 | Open | 2025-02-19 | |
| L16028 | Sportsman Rd | Higher Brook | Short span | Town | 2011 | 7 | Good culvert 7 | Open | 2025-06-27 | $416,000 likely, at bid prices; $200,000 at unit cost |
Chapter 90: MassDOT apportionments and the Comptroller’s payment records (CTHRU), FY2017–FY2027; “not yet reimbursed” means apportioned money not found in the payment records. Bridges: MassDOT’s bridge inventory and the federal National Bridge Inventory, town-owned structures only; a bridge on a town line counts in part to each town. Dams: Office of Dam Safety inventory, town-owned only. Repair grants: EEA, Division of Ecological Restoration and MassDOT award lists. These amounts are not in the town’s state money totals above. Method.
Costs and the 2½% limit
State aid covered 23.8% of Ludlow’s general-fund spending in FY2025, down from 34.2% in FY2006.
State aid as a share of general-fund spending
FY2006
34.2%
$15M of $44M · median town 14.1%
FY2016
29.0%
$17.3M of $59.5M · median town 12.2%
FY2025
23.8%
$19.6M of $82.1M · median town 11.5%
Net of state charges, FY2025
22.1%
FY2010: 34.1% · median town 10.0%
State aid is the gross cherry sheet as entered on the tax rate recap; spending is the town’s general-fund expenditures as filed with the Division of Local Services. Net subtracts the charges the state assesses on the same cherry sheet (charter and school-choice tuition, transit, county and other assessments), itemized from FY2010.
Gross state aid went from $15 million in FY2006 to $19.6 million in FY2025, +30.1% in dollars. Consumer prices are the Boston-area CPI-U, up 55.1% over those years; government prices are the federal price index for state and local government purchases, up 74.5%. Fiscal-year averages. Flag: in FY2010, $1.4 million of Ludlow’s gross aid was in receipts the itemized cherry sheet does not show, consistent with school-building reimbursements that ended by FY2024 (not verified line by line). Part of the change since FY2006 may be that phase-out.
Fixed costs against the 2½% limit, FY2016–FY2025
Health insurance, FY2016–25
+9.6%
$8.8M to $9.7M · all towns +54.0%
All fixed costs, FY2016–25
+38.5%
$12M to $16.7M · all towns +53.0%
Years squeezed
4 of 9
fixed costs grew faster than allowed levy growth
Health insurance
3 of 9
years it grew faster than allowed levy growth
Nine years at 2.5% add 24.9%. Grown that way from FY2016, Ludlow’s health insurance would have been $11 million in FY2025; it was $9.68 million, $1.35 million below the path. Its fixed costs would have been $15 million in FY2025; it was $16.7 million, $1.64 million above the path.
Fixed costs are employee benefits, retirement, insurance and similar costs in the general fund; health insurance comes from a separate DLS report. Allowed levy growth is 2.5% plus new growth, as a share of the prior year’s levy limit; a year counts as squeezed when fixed costs grew by a larger percentage.
Local earmarks against the health-insurance increase
Over the nine budgets, earmarks to Ludlow’s government came to $685,000, 80.7% of the $849,000 rise in its health insurance.
| Measure | Earmarks | Share of the increase | All towns, pooled |
|---|---|---|---|
| To the city or town government | $685,000 | 80.7% | 13.0% |
| Placed in the city or town | $2.3M | 2.7 times | 41.2% |
| Everything placed | $2.3M | 2.7 times | 45.2% |
An earmark is a one-year appropriation; a health-insurance increase recurs in every later budget. Earmarks are counted on the three measures and are not adjusted for the January 2024 mid-year cuts or the FY2026 hold. All towns: pooled over the towns that reported health insurance in both years. All dollars nominal. Method.
The Commonwealth in Ludlow
Ludlow has 1,376 acres of mapped state conservation and recreation land and 1,047 acres of land coded as chapter land.
State conservation and recreation land
1,376 acres
7.9% of Ludlow’s land
Chapter 61, 61A and 61B land
1,047 acres
6.0% of Ludlow’s land · 61 parcels
Agricultural Preservation Restrictions
0 acres
state farmland program
Conservation restrictions
1,818 acres
all holders; each approved by the state
| Layer | Parcels | Acres |
|---|---|---|
| State conservation and recreation land | 22 | 1,376 |
| Other state-owned parcels (assessor records) | 51 | 1,443 |
| Chapter 61 forest land | 19 | 503 |
| Chapter 61A farm land | 25 | 212 |
| Chapter 61B recreation land | 17 | 333 |
| Partly enrolled (mixed-use parcel) | 2 | 283 |
| Conservation restriction | 14 | 1,818 |
| Agency | Parcels | Acres |
|---|---|---|
| Fisheries and Wildlife | 14 | 1,227 |
| DCR State Parks and Recreation | 12 | 164 |
| DCR Water Supply Protection | 25 | 52 |
| Place | Agency | Acres | Article 97 |
|---|---|---|---|
| Facing Rock WMA | Fish and Game (MassWildlife) | 1,230 | |
| Red Bridge State Park | DCR State Parks and Recreation | 52 | |
| Ludlow State Forest | DCR State Parks and Recreation | 50 | |
| Nash Hill Reservoir | State: Massachusetts Water Resources Authority | 38 | |
| Chicopee Memorial State Park | DCR State Parks and Recreation | 4 | |
| Thompson Pool | DCR State Parks and Recreation | 1 |
State conservation and recreation land: MassGIS Protected and Recreational OpenSpace, land owned by a state agency, with MassGIS’s acres. State-owned parcels: assessors’ records (MassGIS standardized parcels, Commonwealth reimbursable land, codes 910–919), mapped acres; this is the land the state pays PILOT on, so it overlaps the open-space layer, and the Division of Local Services’ own acreage, above, is the official count. Chapter land: parcels coded 6, 7 and 8 (Chapter 61 forest, 61A farm, 61B recreation), taxed at their current use rather than full market value; towns code chapter land differently, and mixed-use parcels with a chapter portion are shown but not counted in the acres. Restrictions: MassGIS open space; restricted private land shows its holder, not its owner. Acres are mapped acres and may differ from deeds.
Roads: who maintains what
Of 137.4 miles of public road in Ludlow, the state maintains 6.1 (4%); local government and others maintain the rest.
| Jurisdiction | Miles | Share |
|---|---|---|
| MassDOT | 6.0 | 4% |
| DCR | 0.1 | 0% |
| Town-accepted | 123.4 | 90% |
| Unaccepted public ways | 6.7 | 5% |
Habitat, forest and water
Ludlow has 4,331 acres of mapped core habitat, 25% of its land area; 1,962 of those acres are outside any protected land.
Land and Water Index
53 / 100156th of 351 (1 = most forest kept, most core protected, least impaired water)
Rank under other weightings: 117th to 182nd.
Ludlow kept about as much of its 1971 forest as the typical town; has lost forest since 2001 faster than most towns; has a typical share of its core habitat on protected land; and less of its assessed water is on the impaired list than in most towns; its score of 53 stays between 117th and 182nd under every weighting tested.
Core habitat (BioMap)
4,331 acres
25% of its land area · 179th of 351 · median town 25%
Core habitat on protected land
2,369 acres
55% of its core · state, federal, town, land-trust, restricted or chapter land
Forest, 1971 to 1999
-10.9%
10,767 → 9,597 acres · median town -9.7% · 189th of 351 (1 = most gained)
Assessed water impaired
20%
24 of 448 lake acres; 4.7 of 13.2 river miles · median town 67% · 35th of 351 (1 = least)
Map of the habitat, wetland and protected layers, the forest record back to 1830, and the lakes and rivers on the impaired list: Ludlow: habitat, forest and water. All 351 on one map: habitat, forest and water, statewide.
Core habitat is BioMap (2022), the land the state’s biologists mapped as most important for rare species, intact forest, wetlands and streams. Protected land is state, federal, municipal and land-trust open space with permanent protection, land under a conservation or farmland restriction, and chapter land (the weakest of the three; it can leave the program on notice). Forest is MassGIS land use, 1971 to 1999, one method, with forested wetland counted as forest; later maps use different methods and are shown on the land page. Forest since 2001 is USGS Annual NLCD land cover, 2001 and 2023 (Collection 1). Impaired water is MassDEP’s 2022 Integrated List, assessed waters only; category 4C listings are for causes that are not pollutants, such as invasive plants. Shares are of the municipality’s land area (Census 2020).
Schools
Ludlow’s required school contribution is 2.8% of median household income, 136th highest of 351.
Chapter 70 aid, FY2026
$15M
to the town’s district
Required local contribution
$20M
FY2026
Share of household income
2.8%
136th of 351 (1 = highest)
Real aid per pupil, FY2017–26
−1%
after inflation
Ludlow runs its own school district.
Real figures use the CPI-U, fiscal-year average, in FY2026 dollars. The required contribution is the local share the state sets under the Chapter 70 formula; the share of income divides it per household by the town’s median household income.
School buildings
The Massachusetts School Building Authority approved grants of up to $27.9 million for schools serving Ludlow, FY2017 to August 2026.
Approved, Ludlow’s share
$27.9M
$1,337 per resident (130th of 351)
Projects
1
approved, July 2016 to August 2026
Statewide
$8.85B
shared by 280 of 351 municipalities
The Massachusetts School Building Authority is an independent state authority funded by one penny of the 6.25% state sales tax. Its Board approves grants for new and renovated schools (the Core program) and for roofs, windows and boilers (Accelerated Repair), and pays a share of eligible costs that rises with a community’s need. These grants are shown on their own: they are not in Ludlow’s state money, its Fairness Index, its burden index or its peer comparisons. The Comptroller’s payment records do not carry the authority’s payments, and a single building can outweigh a decade of other state aid.
| Year | School | District | Program | Maximum grant | Ludlow’s share |
|---|---|---|---|---|---|
| FY2018 | Chapin Street Elementary School | Ludlow | Core | $27.9M | $27.9M |
Cost after approval. Of the one project closed with a final audit, the final cost was $54.6 million against an approved budget of $57.5 million (under by $2.9 million); the local share moved from $29.5 million to $27.4 million. Approved budgets include contingency.
Amounts are the Maximum Total Facilities Grant the Board approved, a ceiling that includes contingency; the authority pays eligible costs as they are incurred and settles the final grant at audit. Year is the state fiscal year of the Board vote. Method.
Peers
Ludlow ranks 1st of 11 on earmark dollars placed in the city or town per resident among itself and its ten nearest peers.
Peers are the ten municipalities nearest to Ludlow on population, income need and tax-base need. The best and lowest performers are the highest and lowest on earmark dollars placed in the city or town per resident in the wider class of 30 nearest, the second of three measures.
Of the $2.8 million in earmarks placed in Ludlow, $2 million (73%) went to organizations rather than to Ludlow’s government.
| Municipality | Fairness Index | Formula aid per resident | Competitive per resident | Earmarks placed in the city or town, per resident (enacted) | Burden index | School contribution, share of income |
|---|---|---|---|---|---|---|
| Ludlowthis town | 42 | $10,596 | $407 | $132† | 1.85 | 2.8% |
| South Hadleypeer | 40 | $9,190 | $458 | $31.82 | 1.61 | 2.5% |
| Belchertownpeer | 49 | $13,722 | $401 | $15.27 | 2.92 | 2.5% |
| Agawampeer | 45 | $11,619 | $247 | $23.34 | 0.39 | 2.7% |
| Milfordpeer | 54 | $15,901 | $146 | $36.10 | 0.26 | 3.1% |
| Oxfordpeer | 52 | $13,864 | $491 | $15.69 | 1.37 | 2.7% |
| Middleboroughpeer | 45 | $12,235 | $110 | $12.65 | 0.78 | 2.8% |
| Easthamptonpeer | 41 | $9,515 | $1,083 | $51.82 | 3.73 | 2.9% |
| Randolphpeer | 46 | $11,148 | $123 | $35.83 | 0.23 | 2.3% |
| Dudleypeer | 60 | $17,447 | $442 | $36.88 | 1.55 | 2.5% |
| Clintonpeer | 53 | $14,443 | $344 | $28.88 | 1.51 | 2.4% |
| Holbrookbest in class of 30 | 62 | $18,686 | $238 | $187 | 0.92 | 2.4% |
| Carverlowest in class of 30 | 50 | $13,650 | $330 | $7.68 | 0.83 | 3.0% |
Formula aid per resident is the ten-year gross total; competitive grants are ten-year totals paid, FY2017–FY2026; earmarks are enacted clauses placed in the city or town over the same ten state budgets. † More than half of that municipality’s placed earmarks went to organizations rather than to its government. Add up to ten towns to the table; adding needs JavaScript.
Sources
Every figure traces to a public record.
The Commonwealth in the town
Fairness Index
Representation
State money
What the town carries
- MassDOT Chapter 90 apportionment and Road Inventory
- FHWA National Bridge Inventory, 2025
- MassDOT Bridges layer (GeoDOT)
- North Atlantic Aquatic Connectivity Collaborative, road-stream crossings
- DCR Office of Dam Safety inventory, via MassGIS
- American Community Survey housing tables, U.S. Census Bureau
- State grant award lists (Community One Stop, MVP, Green Communities and others)
- DLS Databank, state-owned land eligible for PILOT
- DLS Databank, new growth
Costs and the 2½% limit
- DLS Databank, Schedule A general fund expenditures and revenues
- DLS Databank, health insurance expenditures
- DLS Databank, revenue by source (state aid)
- DLS Databank, cherry sheet receipts and charges by program
- DLS Databank, new growth and levy limits
- Boston-area CPI-U (BLS) and state-local price index (BEA), via FRED
School buildings
Every figure on this page is built from these public sources. Method and limits.
Parcenomics helps towns turn numbers like these into a plan. Municipal services · Contact
Massanomics Weekly Every Tuesday
Your city or town, in the numbers that matter.
- This week’s story, with where your city or town stands
- Economics, housing and the state money that reaches you
- Land, climate, history and politics
- Side-by-side findings that show how it all connects